$1.255   ROL.ASX
 
  • Home
  • About Us
    • Business Overview
    • Director's Biographies
    • Management Biographies
  • Our Projects
    • Romang Island
      • Lakuwahi Project
      • North Romang Project
    • Philippines
  • Investor Centre
    • Welcome
    • Investor Fact Sheet
    • Investor FAQs
    • Share Price Information
    • Shareholder Services
    • ASX Announcements
    • Top 20 Shareholders
    • Annual Reports
    • Financial Reports
    • Presentations
    • Capital Overview
    • Corporate Governance
  • Media Centre
    • Welcome
    • Media Fact Sheet
    • Image Gallery
  • Contact Us
18/03/2012 8:56 pm
Batu Mas Drilling
 
 
Romang Island
 
Lakuwahi Project
Batu Mas
Batu Hitam
Batu Jagung
 
North Romang Project
Wyaru
Kiahar
 
Philippines
  Maiden JORC Code compliant Resources Estimate from Lakuwahi.
Read more
 
 
  Exploration Drilling Significantly Expands Mineralisation at Batu Hitam Prospect where over 90% of holes intersected potentially economic mineralised rock.
Read more
 
 
  206 METRES of Continuous Precious and Base Metal-Rich Mineralisation Drilled on the North-Eastern Extensions of Batu Mas, Romang Island Indonesia.
Read more
 
 
 

Metallurgical test work to date indicates excellent recoveries of 94-95% and strike length is over 350 metres and remains open in all directions. Initial results from the 3D IP survey carried out have extended the anomaly at Batu Mas by as much as 20 times its current size. In addition, a number of new drill targets have been defined.

Recent Drilling Highlights

  LWD 051 57.5 metres at 6.75 g/t Au equivalent† Incl. 27m at 9.36 g/t Au equivalent and 15m at 217 g/t Ag and 3.31 g/t Au
  LWD 055 21 metres at 2.92 g/t Au equivalent Incl. 10m at 4.74 g/t Au equivalent 83 metres at 2.7% comb. Pb+Zn+Cu Incl. 28m at 5.3% comb. Pb+Zn+Cu
  LWD 068 74 metres at 2.4% comb. Pb+Zn+Cu Incl. 3m at 4.3% Cu
  LWD 072 57 metres at 3.83 g/t Au equivalent Incl. 32m at 5.76 g/t Au equivalent and 20m at 7.40 g/t Au equivalent 54m at 2.75% combined Pb+Zn+Cu
  LWD 074 58 metres at 2.71 g/t Au equivalent Incl. 13.7m at 4.47 g/t Au equivalent and 6.3m at 1.69% Cu


<BACK                                           Show Batu Mas Drill Results>>>
      <<<BACK 

Batu Mas Drill Results (Hide >>>)


Hole # From (m) To (m) Au Equiv (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%)
LWD015 0 41 2.98 100.0 N/A .37 N/A
LWD016 10 20 1.15 36.0 N/A 1.31 N/A
LWD017 22 49 2.99 47.7 N/A N/A N/A
  33 38 4.52 5.0 N/A N/A N/A
  42 49 5.32 168.7 N/A N/A N/A
LWD018 38.4 45.05 .88 34.44 N/A N/A N/A
LWD019 46.9 65 .73 10.84 N/A N/A N/A
LWD020 10 10.95 2.43 71.0 N/A N/A N/A
  17.95 51 3.29 110.66 N/A N/A N/A
  28 39 4.34 113.0 N/A N/A N/A
LWD021 0 2.45 3.59 29.24 N/A N/A N/A
  27.35 47.95 1.83 45.7 N/A N/A N/A
LWD022 33 40 1.35 20.56 N/A N/A N/A
LWD023 22.5 24.5 1.7 46.0 N/A .93 .05
  53.5 55.8 .25 10.0 N/A 1.49 .74
  70.65 73 .4 4.0 N/A .8 1.53
  89.75 90.15 .57 22.0 N/A 3.63 4.15
LWD024 23.75 36.25 3.03 107.0 N/A .49 .01
  33.95 36.25 7.09 333.0 N/A .5 N/A
  43.75 78 .34 8.0 .09 1.27 1.16
  43.75 45.75 1.05 42.0 N/A 5.19 .03
  50.5 72.75 .31 7.0 N/A 1.16 1.48
  56.05 57.75 .68 24.0 N/A 4.7 3.48
LWD025 8.7 13.7 .19 8.0 N/A .25 1.1
  22.7 24.7 1.74 44.0 N/A .9 .03
  45.7 46.5 .79 6.0 N/A 1.13 .06
  86.7 109.7 .92 23.49 .15 2.54 2.27
  90.7 94.4 1.92 54.78 .33 8.76 4.47
  92.1 94.1 2.99 89.0 .54 15.0 6.04
LWD046 0 23 6.7 67.0 .27 1.34 1.68
  3 11 7.4 130.0 .4 2.05 3.42
  6.5 19 .86 70.0 .46 2.24 2.94
  8 12 2.71 84.0 .51 4.02 7.72
LWD048 0 61 4.5 61.0 .25 .32 N/A
  40 70 .63 89.0 .44 .98 .38
  40 55 N/A 168.0 .8 .71 .05
  58 70 N/A 11.0 .05 1.42 .87
LWD049 8.5 49 1.97 47.0 N/A .48 N/A
  38 54 .17 100.0 .2 1.43 .26
  71 76 .46 11.0 .06 .38 1.95
LWD051 1.5 59 .18 90.0 N/A 1.09 N/A
  3 30 .49 47.0 N/A N/A N/A
  29 51 .29 159.0 .09 2.47 .02
  26 41 .34 217.0 N/A 2.4 N/A
  29 53 .17 155.0 N/A 2.4 N/A
LWD054 2 31 .6 26.0 N/A .19 N/A
LWD055 2 23 .91 33.24 N/A .39 N/A
  2 12 4.74 16.1 .12 .73 N/A
  28 111 .29 8.94 .18 1.17 1.39
  70 98 .45 17.0 .25 2.15 2.9
LWD058 11 24 1.0 23.92 N/A N/A N/A
  31 117 .21 4.0 .05 .56 .94
  36 44 .65 16.0 .08 1.02 3.87
LWD062 1.5 84 1.59 34.0 N/A N/A N/A
  22.5 34 3.07 114.0 N/A N/A N/A
  59 72 3.72 44.0 N/A N/A N/A
LWD064 10 15 .99 38.4 N/A N/A N/A
  37 49 1.48 54.08 .21 1.58 .31
  73 86 .53 14.0 .06 1.01 1.49
LWD065 2 63.5 1.3 42.88 N/A N/A N/A
  63.5 83.5 .46 12.75 .07 .98 1.35
  157 160 .24 9.67 .06 1.11 4.45
LWD068 1 40 1.03 19.18 N/A N/A N/A
  11 24 1.73 30.08 N/A N/A N/A
  58 132.5 .31 7.72 .35 1.0 1.01
  58 67 .74 19.67 1.73 1.83 .43
  62 65 1.15 30.67 4.31 2.61 .7
  84.5 90.5 .53 21.0 .45 2.8 2.45
LWD069 8 20 1.89 8.67 N/A N/A N/A
  63 87 1.18 27.85 .15 .55 .53
  68.5 153.5 .45 11.41 .05 .52 .73
  119 122 .39 8.0 .04 1.59 2.95
LWD071 0 41 1.71 43.91 N/A N/A N/A
  2 8 3.18 41.17 N/A N/A N/A
  19.5 23.5 3.39 116.5 N/A N/A N/A
  24.5 50 1.01 23.1 .29 1.06 .46
  36 42 1.19 26.0 .71 1.29 .29
LWD072 0 57 3.83 39.64 N/A N/A N/A
  21 53 5.76 64.65 N/A N/A N/A
  26 51 6.7 78.67 N/A N/A N/A
  29 49 7.4 84.84 N/A N/A N/A
  49 103 .86 20.57 .09 1.79 .86
LWD074 0 58 2.71 23.16 N/A N/A N/A
  40.5 54.2 4.47 74.12 N/A N/A N/A
  54.2 60.5 1.35 54.24 1.69 .54 .23
LWD075 13 50 1.54 55.51 N/A N/A N/A
  30 32 4.5 181.5 N/A 1.06 N/A
  31 91 .63 19.82 .07 .74 .29
LWD076 0 2 N/A N/A .04 1.11 .82
  8 12 N/A N/A .13 .32 1.0
LWD078 30 37 1.97 51.29 N/A N/A N/A
  41 131 .17 2.82 .03 .59 .65
  41 47 .46 12.83 .09 2.89 1.83
LWD079 2 4 .12 N/A .03 .74 .31
LWD081 18 146 .18 1.99 .06 .33 .65
  19 21 .49 16.0 .1 1.49 3.18
  80 81 .29 10.0 .1 3.76 7.11
  97 100 .34 11.67 .13 3.09 4.67
  107 109 .17 5.0 .17 1.05 3.43
LWD083 29 43 5.13 203.0 .26 1.84 3.26
  34 37 11.97 556.0 .43 3.42 7.41
  29 49 3.76 145.4 .24 1.55 2.72
  41 43 2.43 62.5 .39 2.12 4.77
LWD084 83 103 .46 13.78 .43 2.71 5.52
  86 97 .6 21.77 .62 4.21 9.44
  86 91.5 .91 40.45 1.05 7.67 16.42

 

Notes:
The information in this announcement that relates to Exploration Results, Mineral Resources or Ore Reserves is based on complied by John Levings BSc, who is a Member of The Australasian Institute of Mining and Metallurgy and who has more than ten years experience in the field of activity being reported on. Mr Levings is a director of the Company. Mr Levings has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and to the activity, which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Levings consents to the inclusion in the announcement of the matters based on his information in the form and context in which it appears. 1 All thicknesses are down-hole drilled thicknesses. 2 Au Equivalent (Gold Equivalent) = gold assay + (silver assay / 60) where the number 60 represents the ratio where 60 g/t Ag = 1g/t Au. This ratio was calculated from the fifteen year average prices of gold and silver prices from January 1995 to 30 December 2010 World Bank Commodity Price Data (average Gold price is USD $515.98 per Troy Ounce and average Silver price is USD $8.58 per Troy Ounce). Metallurgical test results previously reported have indicated high extraction rates (94%-95%) for both gold and silver using standard technology. 3 Cu Equivalent (Copper Equivalent) = [(copper assay x copper price x 22.05) + (gold assay x gold price/31.1) + (silver assay x silver price/31.1) + (zinc assay x zinc price x 22.05) + (lead assay x lead price x 22.05)] / (copper price x 22.05). The metal prices used in this copper equivalent calculation were taken from the average of the 12 months from January to December 2010 taken from published World Bank Commodity Price Data. The metal prices thus used in the calculation are: Copper: USD $3.42 per pound, gold: USD $1,224.66 per Troy ounce, silver USD $20.20 per Troy ounce, Lead USD $0.9745 per pound and Zinc USD $0.9801 per pound. Preliminary metallurgical test results previously reported (30th November 2010) indicate high and broadly equivalent flotation recoveries for all metals used in the copper equivalent calculation (gold recoveries average 84.3%, silver 93.0%, zinc 97.2%, lead 91.1% and copper 94.6%).

      <<<BACK                         Hide Batu Mas Drill Results>>>


 
                 
       
 
LOGIN     Privacy     Site Map      Glossary      
Copyright © 2010 Robust Resources Limited
Email alerts
Whether you’re a shareholder or not you can subscribe to receive all company announcements through our Email Alerts service.